14 Okt What Is A Build Over Agreement
The other option is for the seller to give the buyer liability insurance to protect themselves from financial losses incurred by building the property in a public sewer. This is the fastest and cheapest option, but whether or not insurance is available depends on the circumstances of each case. Any inspector who has inspected a site on our behalf (whether from a local authority or an independent company) will inform us of developments that are outside the permitted permit limits, i.e. the building/extension has a certain length or whether the canal/drain is particularly large or deep. First of all – Whether the building or extension or the works that include a basement – If you want to build on top of a sewer, you need a construction agreement. This is necessary if you plan to construct a building, extension, basement or similar construction work nearby or directly above an existing sewer. The distance to the sewer depends on several factors, including the depth of the sewer, the criticism of the sewer, etc., although it is usually 3 m. Building control therefore requires both details of the proposal and a copy of the superstructure agreement provided by the remediation authority. Any inspector who has inspected a site on our behalf (whether by a local authority or an independent company) will inform us when inspections have taken place and will also inform us of the result, for example. B if the construction is approved. If a construction contract has not been concluded, the seller must have a CCTV inspection of the sewer carried out and transmit the images to the water company.
If the water company is satisfied that the sewer is in good condition, it will issue an administrative letter confirming that the sewer is in satisfactory condition. The comfort letter usually convinces the buyer and their mortgage lender that the water company will not take steps to demolish the offensive structure above the public sewer. Any building inspection body operating under our “Protocol” will refer all cases where a construction agreement on construction may be required of us for further investigation. In certain circumstances, we may issue a retrospective construction contract if work has already been done over or near a public sewer. .